Free Tool
Tech Debt Cost Calculator
Quantify how much tech debt is costing your engineering team in salary and lost velocity.
Engineering Team
8
130000
30%
3×/wk
Tech Debt Cost
Risk Level: High
$312,000
Annual cost of tech debt
4,992 hrs
Engineering hours lost/yr
2.4 FTEs
Equivalent wasted headcount
70%
Velocity gap vs Elite teams
Industry benchmark: Elite DORA teams spend <10% of sprint capacity on unplanned work. High-performing teams stay under 20%.
Take the DORA Metrics assessment →How this calculator works
Formula
- Annual cost = engineers × salary × debt%
- Hours lost = engineers × 2080 × debt%
- FTEs = annual cost ÷ salary
- Velocity gap = max(0, (10 − deploys/wk) ÷ 10) × 100
Inputs
| Input | Unit | Default |
|---|---|---|
| Team size (engineers) | people | 8 |
| Avg annual salary ($) | USD/year | 130000 |
| % of sprint time on tech debt | % | 30 |
| Current deploy frequency (per week) | deploys/week | 3 |
Outputs
- Annual cost of tech debt:
- Team size × salary × tech-debt%
- Engineering hours lost/yr:
- Team size × 2080 × tech-debt%, rounded
- Equivalent wasted headcount:
- Annual cost ÷ salary (= team × %), 1 dp + " FTEs"
- Velocity gap vs Elite teams:
- max(0, (10 − deploys/week) ÷ 10 × 100), 0 dp
- Risk Level:
- tech-debt% >40 Critical; >25 High; >15 Medium; else Low
Assumptions
- 2,080 working hours per engineer per year
- Velocity gap is measured against 10 deploys per week
- Risk thresholds on tech-debt %: >40 Critical, >25 High, >15 Medium, else Low
- Salary only; no benefits or overhead
Worked example
Inputs: 8 engineers, $130,000, 30% on tech debt, 3 deploys/week
Result: Annual cost $312,000; 4,992 hrs lost; 2.4 FTEs; Velocity gap 70%; Risk Level High
Results are estimates from the inputs you provide and the assumptions above, not financial advice.