TC
ToolCompared
Free Tool

Tech Debt Cost Calculator

Quantify how much tech debt is costing your engineering team in salary and lost velocity.

Engineering Team

8
130000
30%
3×/wk

Tech Debt Cost

Risk Level: High
$312,000
Annual cost of tech debt
4,992 hrs
Engineering hours lost/yr
2.4 FTEs
Equivalent wasted headcount
70%
Velocity gap vs Elite teams

Industry benchmark: Elite DORA teams spend <10% of sprint capacity on unplanned work. High-performing teams stay under 20%.

Take the DORA Metrics assessment →

How this calculator works

Formula

  • Annual cost = engineers × salary × debt%
  • Hours lost = engineers × 2080 × debt%
  • FTEs = annual cost ÷ salary
  • Velocity gap = max(0, (10 − deploys/wk) ÷ 10) × 100

Inputs

InputUnitDefault
Team size (engineers)people8
Avg annual salary ($)USD/year130000
% of sprint time on tech debt%30
Current deploy frequency (per week)deploys/week3

Outputs

Annual cost of tech debt:
Team size × salary × tech-debt%
Engineering hours lost/yr:
Team size × 2080 × tech-debt%, rounded
Equivalent wasted headcount:
Annual cost ÷ salary (= team × %), 1 dp + " FTEs"
Velocity gap vs Elite teams:
max(0, (10 − deploys/week) ÷ 10 × 100), 0 dp
Risk Level:
tech-debt% >40 Critical; >25 High; >15 Medium; else Low

Assumptions

  • 2,080 working hours per engineer per year
  • Velocity gap is measured against 10 deploys per week
  • Risk thresholds on tech-debt %: >40 Critical, >25 High, >15 Medium, else Low
  • Salary only; no benefits or overhead

Worked example

Inputs: 8 engineers, $130,000, 30% on tech debt, 3 deploys/week

Result: Annual cost $312,000; 4,992 hrs lost; 2.4 FTEs; Velocity gap 70%; Risk Level High

Results are estimates from the inputs you provide and the assumptions above, not financial advice.