Free Tool
Incident Response Cost Calculator
Estimate the full cost of a production incident — labor, revenue loss, and annual exposure.
Incident Parameters
3
85
2 hrs
50,000
12
Cost Per Incident
$765
Engineer labor (1.5× overtime)
$137
Revenue loss
$902
Total per incident
$10,824
Annual incident cost
Revenue loss = MRR ÷ 730 hours × resolution time. Labor includes 1.5× overtime rate.
Tip: Incident management tools like PagerDuty and Incident.io can cut MTTR by 40–60%, saving $5,412 per year.
Compare incident management tools →How this calculator works
Formula
- Labor = engineers × rate × hours × 1.5
- Revenue loss = MRR ÷ 730 × hours
- Per incident = labor + revenue loss
- Annual = per incident × incidents/year
Inputs
| Input | Unit | Default |
|---|---|---|
| Engineers involved | people | 3 |
| Avg hourly rate ($) | USD/hour | 85 |
| Resolution time (hours) | hours | 2 |
| Monthly Recurring Revenue ($) | USD/month | 50000 |
| Incidents per year | incidents/year | 12 |
Outputs
- Engineer labor (1.5× overtime):
- Engineers × hourly rate × resolution hours × 1.5
- Revenue loss:
- MRR ÷ 730 × resolution hours
- Total per incident:
- Labor + revenue loss
- Annual incident cost:
- Total per incident × incidents per year
Assumptions
- 1.5× overtime multiplier on all incident labor
- 730 hours per month (365 days × 24 hours ÷ 12), the same as the downtime calculator
- All revenue is lost for the full resolution time
- The savings tip assumes better tooling halves annual incident cost — an illustration, not a measurement
Worked example
Inputs: 3 engineers, $85/h, 2 h, $50,000 MRR, 12 incidents/yr
Result: Labor $765; Revenue loss $137; Total per incident $902; Annual $10,824; tip savings $5,412/yr
Results are estimates from the inputs you provide and the assumptions above, not financial advice.